Avalon Place Plan Update: Dunbar Park Works - October 2026
Dunbar Park changes: Picnic shelter and seating Installation commences


Shared Space at Avalon Beach: Update
BackgroundWe created a temporary shared space in Avalon Beach Village to create a safer space for people to shop and relax under "Streets as Shared Spaces''.ConsultationFollowing a trial, we exhibited a concept plan for making the shared space permanent, and received feedback from 89 people.Next stepsWe will refine the plan, taking your feedback into consideration. We anticipate construction to commence Autumn 2027.
At the council meeting on 17 December 2025, the council accepted the tender of Nangle Pty Ltd for the sum of $170,900 excluding GST for design services for the permanent installation of the one-way shared zone, and in keeping with the character of Avalon Beach, prepare a design for 'high-quality upgrades to seating, lighting, landscaping and other infrastructure'.
Nangle as the landscape architect, led a team of experts including civil, hydraulic and stormwater engineers and has prepared the concept plan to make the shared space permanent, the council states.
These concept plans are now on exhibition, with the council inviting residents to provide feedback for the same.
These show the one-way zone is being extended beyond the shared zone. The council states the extension of the one-way zone aims to:
- simplify traffic movements
- reduce vehicle conflicts
- improve pedestrian safety and comfort
- support a more cohesive shared street environment.
One of the key priorities for this project was to address the existing flooding issues at the site. While flooding cannot be fully eliminated due to the site’s position as a natural low point and in an ancient flood zone, the council states the project improves stormwater management by:
- introducing better drainage and flow paths
- using permeable paving and water sensitive urban design
- adjusting pavement grades to keep water moving through the shared zone and avoid ponding.
There are a number of proposed changes to parking arrangements, to make vehicle movements simpler and safer along with improving flooding issues:
- Closing the existing carpark entrance to provide a single entry and exit point for the carpark, further away from the shared zone.
- Replacing the 90-degree and parallel parking along Old Barrenjoey Road with 60-degree parking on both sides.
- The short-stay parking will be formalised, with 3 spaces proposed to be located on the eastern side of the street to improve access and passenger safety.
The council states the proposed changes are intended to improve vehicle movements and increase pedestrian safety and will result in the addition of one car parking space.
The choice of works timing relates to not interfering with peak trading Season in the village - Summer.
Residents can download those plans and artist drawings, and read the updates, at: https://streets-shared-spaces-avalon-beach
Avalon Shared Space soon after it was first completed. Photo: AJG/PON